sc division - sw.1 bpq- kzj section - repairs to bridge protective works such as flooring,steps, pitching, face walls, toe wall, epoxy grouting, epoxy plastering, scour filling,curtain/drop walls, pointing etc., at bridge nos.173,174,176 to 178, 180, 183, 184,188,189,192,193,195,200, 202, 214, 219, 221, 223 to 225, 230, 232, 233, 236 to 238, 246, 247,251, 256, 266, 268 to 277, 284, 289, 293. 299b between magh - bpa stations underaden/bpa section, sw.2: sc division: bpq- kzj section- repairs to b