consultancy services for authority’s engineer for “widening &
strengthening of bongaon-chakdaha road (sh-1), from 2-lane
with paved shoulder to standard 4-lane configuration from
0+000 km to 6+717 km and from 10+568 km to 31+328 km
including 2 truck terminals in phase-i (part-a i.e. total
project length-27.477 km) excluding gopalnagar r.o.b. and
flyover in the districts of north 24 parganas and nadia” to
be executed through epc.