maintenance work of jabalpur- hiran river section of nh- 12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp- iii on epc mode on the risk and cost of the epc