construction of road over bridge (rob) 1x 36.0 mtr composite girder + 2x 24.0 mtr composite girder + 4x 18.75 mtr t-beam girder with other allied works such as approach road, re wall, service road, drain etc. in lieu of lc no-334 at km 633/5-7 between ipm