pdg. and laying of 200 mm thick gsb, 175 mm thick wmm, 50 mm thick dbm, 30 mm thick bc with tack coat, internal water supply line, sewerage system, rcc storm water drainage system and constn. of 2 no. pus and construction of 4 nos. rainwater harvesting r