major overhauling along with supply of spares of the bhel make 37.2 mw steam turbine (hnk 71/2.8-4, t-669) and steam turbine generator (tari 800-24 p, tg 1587) unit-8 of waste heat recovery project (whrp) at lakwa thermal power station, apgcl, maibella