(a) hoisting burnt submersible pump with cable at vtc borehole and lowering repaired pump with cable (b) replacing b/d 1000 gpm turbine pump of river side sump with 2000 gpm pump (c) other misc.jobs related to pumping and pipe line at muraidih, ampc.