shifting of 1no.dtr, 2nos 11kv 9.1mrs pscc poles and 3nos. lt 8.0mtrs pscc poles located at h.no.14-137/4/1/10/1 and opposite h.no.13-1/54 due to falling within the alignment of the newly proposed drain work on the request of m/s. commissioner ghmc, in mirzalguda section of malkajgiri sub division in sainikpuri division of habsiguda circle under dcw.